2018考研英语阅读真题:世界海拔最高超特长公路隧道通车
中新网 2017-10-06 14:41
据西藏自治区甘孜州交通运输局局长王强表示,该项目耗资约12.8亿元人民币(196,900美元)。
He said the two-way tunnel has a speed limit of 40 kph and takes around 10 minutes to pass through.
王强表示,双向隧道的限速为40公里,大约需要10分钟才能通过。
Previously vehicles spent more than two hours driving around the mountain on a road threatened by landslides, blizzards and slippery ice, he said.
王强说,开通隧道前,车辆需要在山路上花两个多小时,遭受山体滑坡、暴风雪和滑冰的威胁。